CARBON CAPTURE

CARBON CAPTURE

Carbon Capture Membrane in UAE

Many carbon capture and utilization (CCU) pathways require green hydrogen to convert captured CO2 into valuable chemicals and fuels. The UAE's National Hydrogen Strategy targets 1.

Market Context

UAE

Policy

UAE National Hydrogen Strategy

H₂ Target

1.4 MT low-carbon hydrogen by 2031, global top-5 producer

2

Cities

5

Industries

Cost-Effective H2 for CO2 Conversion

CO2 hydrogenation to methanol, methane, or synthetic fuels requires large volumes of hydrogen. IONZERA's lower electricity cost per kg H2 improves the economics of every CCU pathway.

Flexible Operation for Variable CO2 Streams

IONZERA's rapid electrolyte wetting (24-degree contact angle) supports dynamic electrolyser operation, matching hydrogen output to variable CO2 capture rates from industrial sources.

High-Purity H2 Output

Gas crossover below 0.5% H2 in O2 ensures the hydrogen stream meets the purity requirements for catalytic CO2 conversion processes without excessive downstream purification.

Carbon Capture in UAE’s Hydrogen Market

The UAE's National Hydrogen Strategy targets 1.4 MT of low-carbon hydrogen by 2031, positioning the country as a global hydrogen leader. Abu Dhabi's Masdar and ADNOC are investing in hydrogen projects, while Dubai positions itself as a clean energy technology hub. The UAE's strategic location enables hydrogen export to both Asian and European markets.

IONZERA provides UAE hydrogen projects with rapid delivery from India (3-4 days) and competitive pricing, supporting the UAE's ambitions to become a global hydrogen export hub.

Hydrogen ExportRefiningDesalinationIndustrial GasesSolar-to-H2
3x

Lower Resistance

20%

Thinner Profile

PERFORMANCE ADVANTAGE

Why IONZERA for Carbon Capture in UAE

CO2 hydrogenation to methanol, methane, or synthetic fuels requires large volumes of hydrogen. IONZERA's lower electricity cost per kg H2 improves the economics of every CCU pathway.

Shipping & Logistics

Air freight from India to Abu Dhabi/Dubai in 3-4 business days. Sea freight 1-2 weeks.

Area Resistance

3x LOWER
Area Specific Resistance ComparisonIONZERA0.09-0.1 Ω·cm²Zirfon0.30 Ω·cm²00.10.20.3 Ω·cm²~3x Lower

Thickness

20% THINNER
Membrane Thickness ComparisonIONZERA350-410 μmZirfon500 μm500 μm scale20-30%thinnerThinner membrane = More compact stacks= Higher power density

Carbon Capture Membrane in UAE Cities

Frequently Asked Questions

Why choose IONZERA for carbon capture in UAE?

IONZERA delivers 3x lower ionic resistance than Zirfon, making it ideal for carbon capture applications in UAE. IONZERA provides UAE hydrogen projects with rapid delivery from India (3-4 days) and competitive pricing, supporting the UAE's ambitions to become a global hydrogen export hub.

How does IONZERA support UAE's hydrogen export strategy?

IONZERA's 3x lower resistance reduces hydrogen production costs, improving the economics of UAE hydrogen and ammonia export projects. Rapid delivery from India (3-4 days) ensures reliable membrane supply for scaling projects.

Ready to Start

Request Carbon Capture Samples for UAE

Contact G-Hexa for IONZERA carbon capture membrane samples, technical specifications, and volume pricing for UAE-based projects.

Request Sample