BIOGAS

BIOGAS

Biogas Upgrading Membrane in France

Biological methanation converts the CO2 fraction of biogas into additional methane using green hydrogen. France has committed EUR 7.

Market Context

France

Policy

National Strategy for the Development of Decarbonised Hydrogen

H₂ Target

6.5 GW electrolyser capacity by 2030

2

Cities

4

Industries

More Methane from Every Biogas Plant

Raw biogas contains 35-45% CO2. Adding green H2 via methanation converts this CO2 to CH4, increasing biomethane output by up to 70% without additional feedstock.

Lower H2 Production Cost

IONZERA's 3x lower area resistance reduces the cost of the hydrogen input, the primary variable cost in biological methanation, improving the economics of biogas upgrading.

Compact Electrolyser Integration

IONZERA's thin profile enables compact electrolyser stacks that fit within the footprint constraints of existing biogas plant sites, simplifying retrofit installations.

Biogas Upgrading in France’s Hydrogen Market

France has committed EUR 7.2 billion to its hydrogen strategy, targeting 6.5 GW of electrolyser capacity by 2030. With strong nuclear baseload power and growing renewable capacity, France has a cost-competitive electricity base for green hydrogen production. Industrial hydrogen demand from refineries and chemical plants in Lyon, Marseille, and the Rhone valley drives near-term electrolysis deployment.

IONZERA's 3x lower resistance improves electrolyser efficiency, complementing France's low-carbon electricity advantage. For French OEMs and project developers, IONZERA offers diversified sourcing with competitive pricing from Indian manufacturing.

Nuclear-to-H2RefiningChemical ProcessingTransport Hydrogen
3x

Lower Resistance

20%

Thinner Profile

PERFORMANCE ADVANTAGE

Why IONZERA for Biogas Upgrading in France

Raw biogas contains 35-45% CO2. Adding green H2 via methanation converts this CO2 to CH4, increasing biomethane output by up to 70% without additional feedstock.

Shipping & Logistics

Air freight from India in 5-7 business days. Major delivery points in Lyon and Marseille industrial corridors.

Area Resistance

3x LOWER
Area Specific Resistance ComparisonIONZERA0.09-0.1 Ω·cm²Zirfon0.30 Ω·cm²00.10.20.3 Ω·cm²~3x Lower

Thickness

20% THINNER
Membrane Thickness ComparisonIONZERA350-410 μmZirfon500 μm500 μm scale20-30%thinnerThinner membrane = More compact stacks= Higher power density

Biogas Upgrading Membrane in France Cities

Frequently Asked Questions

Why choose IONZERA for biogas upgrading in France?

IONZERA delivers 3x lower ionic resistance than Zirfon, making it ideal for biogas upgrading applications in France. IONZERA's 3x lower resistance improves electrolyser efficiency, complementing France's low-carbon electricity advantage.

How does IONZERA fit France's hydrogen decarbonization strategy?

IONZERA's 3x lower area resistance reduces the electricity consumption per kg of hydrogen, improving the economics of electrolysis powered by France's nuclear and renewable electricity mix. This directly supports France's 6.5 GW electrolyser deployment target.

Can IONZERA be delivered to French industrial hydrogen projects?

Yes. G-Hexa ships IONZERA globally via air freight (5-7 days to France) or sea freight for volume orders. Technical support and sample requests are handled directly by the G-Hexa team.

Ready to Start

Request Biogas Upgrading Samples for France

Contact G-Hexa for IONZERA biogas upgrading membrane samples, technical specifications, and volume pricing for France-based projects.

Request Sample