BIOGAS

BIOGAS

Biogas Upgrading Membrane in Singapore

Biological methanation converts the CO2 fraction of biogas into additional methane using green hydrogen. Singapore's National Hydrogen Strategy positions hydrogen as a key pillar for energy security and decarbonization.

Market Context

Singapore

Policy

National Hydrogen Strategy

H₂ Target

Up to 50% of power from low-carbon imports including H2 by 2050

1

Cities

4

Industries

More Methane from Every Biogas Plant

Raw biogas contains 35-45% CO2. Adding green H2 via methanation converts this CO2 to CH4, increasing biomethane output by up to 70% without additional feedstock.

Lower H2 Production Cost

IONZERA's 3x lower area resistance reduces the cost of the hydrogen input, the primary variable cost in biological methanation, improving the economics of biogas upgrading.

Compact Electrolyser Integration

IONZERA's thin profile enables compact electrolyser stacks that fit within the footprint constraints of existing biogas plant sites, simplifying retrofit installations.

Biogas Upgrading in Singapore’s Hydrogen Market

Singapore's National Hydrogen Strategy positions hydrogen as a key pillar for energy security and decarbonization. Jurong Island's petrochemical cluster and the country's role as a maritime hub create near-term hydrogen demand. Singapore is investing in hydrogen import infrastructure and on-island electrolysis for critical applications.

IONZERA's proximity in Asia (3-4 day delivery from India) and competitive pricing make it ideal for Singapore's pilot and demonstration hydrogen projects, with scalability for Jurong Island industrial applications.

PetrochemicalsMaritime HydrogenPower GenerationRefining
3x

Lower Resistance

20%

Thinner Profile

PERFORMANCE ADVANTAGE

Why IONZERA for Biogas Upgrading in Singapore

Raw biogas contains 35-45% CO2. Adding green H2 via methanation converts this CO2 to CH4, increasing biomethane output by up to 70% without additional feedstock.

Shipping & Logistics

Air freight from India in 3-4 business days. Sea freight 1-2 weeks.

Area Resistance

3x LOWER
Area Specific Resistance ComparisonIONZERA0.09-0.1 Ω·cm²Zirfon0.30 Ω·cm²00.10.20.3 Ω·cm²~3x Lower

Thickness

20% THINNER
Membrane Thickness ComparisonIONZERA350-410 μmZirfon500 μm500 μm scale20-30%thinnerThinner membrane = More compact stacks= Higher power density

Biogas Upgrading Membrane in Singapore Cities

Frequently Asked Questions

Why choose IONZERA for biogas upgrading in Singapore?

IONZERA delivers 3x lower ionic resistance than Zirfon, making it ideal for biogas upgrading applications in Singapore. IONZERA's proximity in Asia (3-4 day delivery from India) and competitive pricing make it ideal for Singapore's pilot and demonstration hydrogen projects, with scalability for Jurong Island industrial applications.

How quickly can IONZERA be delivered to Singapore?

Air freight from Bengaluru to Singapore takes 3-4 business days. The geographic proximity in Asia provides a logistical advantage over European membrane suppliers.

Ready to Start

Request Biogas Upgrading Samples for Singapore

Contact G-Hexa for IONZERA biogas upgrading membrane samples, technical specifications, and volume pricing for Singapore-based projects.

Request Sample