BIOGAS

BIOGAS

Biogas Upgrading Membrane in United Kingdom

Biological methanation converts the CO2 fraction of biogas into additional methane using green hydrogen. The UK targets 10 GW of low-carbon hydrogen production capacity by 2030, with a mix of electrolytic and CCUS-enabled hydrogen.

Market Context

United Kingdom

Policy

UK Hydrogen Strategy

H₂ Target

10 GW low-carbon hydrogen by 2030

1

Cities

4

Industries

More Methane from Every Biogas Plant

Raw biogas contains 35-45% CO2. Adding green H2 via methanation converts this CO2 to CH4, increasing biomethane output by up to 70% without additional feedstock.

Lower H2 Production Cost

IONZERA's 3x lower area resistance reduces the cost of the hydrogen input, the primary variable cost in biological methanation, improving the economics of biogas upgrading.

Compact Electrolyser Integration

IONZERA's thin profile enables compact electrolyser stacks that fit within the footprint constraints of existing biogas plant sites, simplifying retrofit installations.

Biogas Upgrading in United Kingdom’s Hydrogen Market

The UK targets 10 GW of low-carbon hydrogen production capacity by 2030, with a mix of electrolytic and CCUS-enabled hydrogen. Scotland's Aberdeen is emerging as a hydrogen hub leveraging North Sea wind resources and existing oil and gas infrastructure. Industrial clusters in Humberside and Teesside are early movers in hydrogen adoption.

IONZERA provides UK hydrogen projects with a high-performance membrane that improves wind-to-hydrogen economics. Supply chain diversification away from single-source European membrane suppliers strengthens UK project resilience.

Offshore Wind-to-H2Oil & Gas TransitionIndustrial ClustersTransport Hydrogen
3x

Lower Resistance

20%

Thinner Profile

PERFORMANCE ADVANTAGE

Why IONZERA for Biogas Upgrading in United Kingdom

Raw biogas contains 35-45% CO2. Adding green H2 via methanation converts this CO2 to CH4, increasing biomethane output by up to 70% without additional feedstock.

Shipping & Logistics

Air freight from India to UK in 5-7 business days.

Area Resistance

3x LOWER
Area Specific Resistance ComparisonIONZERA0.09-0.1 Ω·cm²Zirfon0.30 Ω·cm²00.10.20.3 Ω·cm²~3x Lower

Thickness

20% THINNER
Membrane Thickness ComparisonIONZERA350-410 μmZirfon500 μm500 μm scale20-30%thinnerThinner membrane = More compact stacks= Higher power density

Biogas Upgrading Membrane in United Kingdom Cities

Frequently Asked Questions

Why choose IONZERA for biogas upgrading in United Kingdom?

IONZERA delivers 3x lower ionic resistance than Zirfon, making it ideal for biogas upgrading applications in United Kingdom. IONZERA provides UK hydrogen projects with a high-performance membrane that improves wind-to-hydrogen economics.

How does IONZERA fit the UK's hydrogen hub model?

IONZERA's high efficiency and competitive pricing support the UK's industrial hydrogen hub strategy by reducing the levelized cost of hydrogen from alkaline electrolysis, making green H2 more competitive with blue hydrogen alternatives.

Ready to Start

Request Biogas Upgrading Samples for United Kingdom

Contact G-Hexa for IONZERA biogas upgrading membrane samples, technical specifications, and volume pricing for United Kingdom-based projects.

Request Sample