GREEN HYDROGEN

GREEN HYDROGEN

Green Hydrogen Production Membrane in Malaysia

Electricity accounts for 60-80% of the levelized cost of hydrogen. Malaysia's petrochemical and refining sectors centered around Kuala Lumpur and Johor create significant hydrogen demand.

Market Context

Malaysia

Policy

National Energy Transition Roadmap (NETR)

H₂ Target

Hydrogen economy development under NETR

1

Cities

4

Industries

Lower Levelized Cost of Hydrogen

By reducing the voltage drop across the membrane by approximately 0.08V per cell, IONZERA lowers the specific energy consumption (kWh/kg H2), directly cutting the electricity component of LCOH.

Bankable Performance Data

IONZERA specifications are measured using standardized electrochemical impedance spectroscopy in 30 wt% KOH, providing the verified performance data that project financiers and EPC contractors require.

Supply Chain Diversification

Sourcing membranes from G-Hexa in India diversifies the supply chain away from sole-source European dependence, reducing project risk for GW-scale deployments.

Scalable Manufacturing

IONZERA's mesh-free production process is inherently simpler to scale than mesh-reinforced alternatives, supporting the rapid capacity ramp needed for the green hydrogen buildout.

Green Hydrogen Production in Malaysia’s Hydrogen Market

Malaysia's petrochemical and refining sectors centered around Kuala Lumpur and Johor create significant hydrogen demand. The country is exploring green hydrogen as part of its energy transition, leveraging its strong solar resources and existing industrial infrastructure.

IONZERA provides Malaysian hydrogen projects with rapid delivery from India (3-4 days) and competitive pricing without European import premiums.

PetrochemicalsRefiningPalm Oil ProcessingSolar-to-H2
3x

Lower Resistance

20%

Thinner Profile

PERFORMANCE ADVANTAGE

Why IONZERA for Green Hydrogen Production in Malaysia

By reducing the voltage drop across the membrane by approximately 0.08V per cell, IONZERA lowers the specific energy consumption (kWh/kg H2), directly cutting the electricity component of LCOH.

Shipping & Logistics

Air freight from India in 3-4 business days.

Area Resistance

3x LOWER
Area Specific Resistance ComparisonIONZERA0.09-0.1 Ω·cm²Zirfon0.30 Ω·cm²00.10.20.3 Ω·cm²~3x Lower

Thickness

20% THINNER
Membrane Thickness ComparisonIONZERA350-410 μmZirfon500 μm500 μm scale20-30%thinnerThinner membrane = More compact stacks= Higher power density

Green Hydrogen Production Membrane in Malaysia Cities

Frequently Asked Questions

Why choose IONZERA for green hydrogen production in Malaysia?

IONZERA delivers 3x lower ionic resistance than Zirfon, making it ideal for green hydrogen production applications in Malaysia. IONZERA provides Malaysian hydrogen projects with rapid delivery from India (3-4 days) and competitive pricing without European import premiums.

Can IONZERA support Malaysia's refinery hydrogen decarbonization?

Yes. IONZERA membranes enable high-efficiency on-site hydrogen production via alkaline electrolysis, supporting Malaysian refineries transitioning from grey to green hydrogen.

Ready to Start

Request Green Hydrogen Production Samples for Malaysia

Contact G-Hexa for IONZERA green hydrogen production membrane samples, technical specifications, and volume pricing for Malaysia-based projects.

Request Sample