EUROPEAN H2 HUB

EUROPEAN H2 HUB

Green Hydrogen Production for Port Hydrogen Infrastructure in Rotterdam

Electricity accounts for 60-80% of the levelized cost of hydrogen. Rotterdam is developing into Europe's premier hydrogen hub, with the port authority investing in hydrogen import terminals, pipeline infrastructure, and large-scale electrolysis.

Local Brief

Rotterdam

Industry Focus

Port Hydrogen InfrastructureRefiningChemical ProcessingOffshore Wind-to-H2

0.1

Ω·cm²

350

μm

3x

Lower

Logistics

Air freight from India in 5-7 business days

Lower Levelized Cost of Hydrogen

By reducing the voltage drop across the membrane by approximately 0.08V per cell, IONZERA lowers the specific energy consumption (kWh/kg H2), directly cutting the electricity component of LCOH.

Bankable Performance Data

IONZERA specifications are measured using standardized electrochemical impedance spectroscopy in 30 wt% KOH, providing the verified performance data that project financiers and EPC contractors require.

Supply Chain Diversification

Sourcing membranes from G-Hexa in India diversifies the supply chain away from sole-source European dependence, reducing project risk for GW-scale deployments.

Scalable Manufacturing

IONZERA's mesh-free production process is inherently simpler to scale than mesh-reinforced alternatives, supporting the rapid capacity ramp needed for the green hydrogen buildout.

Green Hydrogen Production in Rotterdam

Rotterdam is developing into Europe's premier hydrogen hub, with the port authority investing in hydrogen import terminals, pipeline infrastructure, and large-scale electrolysis. The city's refinery and chemical cluster, combined with North Sea offshore wind, positions Rotterdam at the center of European hydrogen trade and production.

For Rotterdam's world-scale hydrogen ambitions, IONZERA provides a performance leap over the locally available Zirfon from neighboring Belgium. With 3x lower resistance, IONZERA improves the economics of the massive electrolysis capacity planned for the Rotterdam port area.

Port Hydrogen InfrastructureRefiningChemical ProcessingOffshore Wind-to-H2
20%

Thinner Profile

3x

Lower Resistance

TECHNICAL ADVANTAGE

IONZERA Performance for Rotterdam

By reducing the voltage drop across the membrane by approximately 0.08V per cell, IONZERA lowers the specific energy consumption (kWh/kg H2), directly cutting the electricity component of LCOH.

Membrane Thickness

20% THINNER
Membrane Thickness ComparisonIONZERA350-410 μmZirfon500 μm500 μm scale20-30%thinnerThinner membrane = More compact stacks= Higher power density

Frequently Asked Questions

Can I get IONZERA green hydrogen production membranes in Rotterdam?

Yes. G-Hexa ships IONZERA membranes to Rotterdam, Netherlands. Air freight from India in 5-7 business days

Why use IONZERA for green hydrogen production in Rotterdam?

IONZERA delivers 3x lower ionic resistance than Zirfon, reducing cell voltage and electricity costs for green hydrogen production applications. For Rotterdam's world-scale hydrogen ambitions, IONZERA provides a performance leap over the locally available Zirfon from neighboring Belgium.

How does IONZERA compare to locally sourced Zirfon for Rotterdam projects?

IONZERA delivers 3x lower area resistance (0.09-0.1 vs 0.30 ohm-cm2), is 20% thinner, and uses mesh-free architecture. These performance advantages outweigh Zirfon's geographic proximity to Rotterdam.

Ready to Start

Request Green Hydrogen Production Samples for Rotterdam

Contact G-Hexa for IONZERA green hydrogen production membrane samples and technical support for your Rotterdam project.

Request Sample