MEGA PROJECT
MEGA PROJECTGreen Hydrogen Production for World-Scale Green H2 in NEOM
Electricity accounts for 60-80% of the levelized cost of hydrogen. NEOM hosts the world's largest planned green hydrogen facility, targeting 600 tonnes per day of green hydrogen for conversion to green ammonia.
Local Brief
NEOMIndustry Focus
Ω·cm²
μm
Lower
Logistics
Air freight from India to NEOM (via Tabuk) in 3-5 business days
Lower Levelized Cost of Hydrogen
By reducing the voltage drop across the membrane by approximately 0.08V per cell, IONZERA lowers the specific energy consumption (kWh/kg H2), directly cutting the electricity component of LCOH.
Bankable Performance Data
IONZERA specifications are measured using standardized electrochemical impedance spectroscopy in 30 wt% KOH, providing the verified performance data that project financiers and EPC contractors require.
Supply Chain Diversification
Sourcing membranes from G-Hexa in India diversifies the supply chain away from sole-source European dependence, reducing project risk for GW-scale deployments.
Scalable Manufacturing
IONZERA's mesh-free production process is inherently simpler to scale than mesh-reinforced alternatives, supporting the rapid capacity ramp needed for the green hydrogen buildout.
Green Hydrogen Production in NEOM
NEOM hosts the world's largest planned green hydrogen facility, targeting 600 tonnes per day of green hydrogen for conversion to green ammonia. The project combines massive solar and wind generation with GW-scale electrolysis, representing the single largest opportunity for AWE membrane deployment globally.
At NEOM scale, membrane efficiency is not a marginal consideration but a project-defining variable. IONZERA's 3x lower resistance across the thousands of cells required for GW-scale production translates to hundreds of millions in lifecycle electricity cost reduction. India's proximity to NEOM (3-5 day delivery) provides supply chain advantages.
Thinner Profile
Lower Resistance
TECHNICAL ADVANTAGE
IONZERA Performance for NEOM
By reducing the voltage drop across the membrane by approximately 0.08V per cell, IONZERA lowers the specific energy consumption (kWh/kg H2), directly cutting the electricity component of LCOH.
Membrane Thickness
20% THINNERFrequently Asked Questions
Can I get IONZERA green hydrogen production membranes in NEOM?
Yes. G-Hexa ships IONZERA membranes to NEOM, Saudi Arabia. Air freight from India to NEOM (via Tabuk) in 3-5 business days
Why use IONZERA for green hydrogen production in NEOM?
IONZERA delivers 3x lower ionic resistance than Zirfon, reducing cell voltage and electricity costs for green hydrogen production applications. At NEOM scale, membrane efficiency is not a marginal consideration but a project-defining variable.
What is NEOM's green hydrogen production target?
NEOM targets 600 tonnes per day of green hydrogen, converted to green ammonia for export. This requires GW-scale electrolysis capacity, creating massive demand for high-performance AWE membranes.
EXPLORE MORE
Request Green Hydrogen Production Samples for NEOM
Contact G-Hexa for IONZERA green hydrogen production membrane samples and technical support for your NEOM project.
Request Sample