BIOGAS

BIOGAS

Biogas Upgrading Membrane in India

Biological methanation converts the CO2 fraction of biogas into additional methane using green hydrogen. India's National Green Hydrogen Mission commits INR 19,744 crore to building a domestic green hydrogen ecosystem.

Market Context

India

Policy

National Green Hydrogen Mission (NGHM)

H₂ Target

5 MT green hydrogen production capacity by 2030

18

Cities

6

Industries

More Methane from Every Biogas Plant

Raw biogas contains 35-45% CO2. Adding green H2 via methanation converts this CO2 to CH4, increasing biomethane output by up to 70% without additional feedstock.

Lower H2 Production Cost

IONZERA's 3x lower area resistance reduces the cost of the hydrogen input, the primary variable cost in biological methanation, improving the economics of biogas upgrading.

Compact Electrolyser Integration

IONZERA's thin profile enables compact electrolyser stacks that fit within the footprint constraints of existing biogas plant sites, simplifying retrofit installations.

Biogas Upgrading in India’s Hydrogen Market

India's National Green Hydrogen Mission commits INR 19,744 crore to building a domestic green hydrogen ecosystem. The country targets 125 GW of electrolyser capacity by 2030, creating massive demand for high-performance AWE separator membranes. With refineries, fertilizer plants, and steel mills concentrated across Gujarat, Maharashtra, and Tamil Nadu, India represents the fastest-growing alkaline electrolysis market globally.

IONZERA is manufactured by G-Hexa Research Center in Bengaluru, making it the only domestically produced high-performance AWE membrane in India. This eliminates import duties, reduces lead times to 2-5 days for any Indian city, and aligns with Make in India and Atmanirbhar Bharat objectives. Indian electrolyser OEMs and project developers benefit from rupee-denominated pricing and direct technical support.

RefineriesFertilizer & UreaSteelChlor-AlkaliAmmoniaRenewable Energy
3x

Lower Resistance

20%

Thinner Profile

PERFORMANCE ADVANTAGE

Why IONZERA for Biogas Upgrading in India

Raw biogas contains 35-45% CO2. Adding green H2 via methanation converts this CO2 to CH4, increasing biomethane output by up to 70% without additional feedstock.

Shipping & Logistics

Shipped from Bengaluru manufacturing facility. 1-2 day delivery to South India, 2-3 days to West and Central India, 3-5 days to North and East India via road freight. Express air cargo available for urgent requirements.

Area Resistance

3x LOWER
Area Specific Resistance ComparisonIONZERA0.09-0.1 Ω·cm²Zirfon0.30 Ω·cm²00.10.20.3 Ω·cm²~3x Lower

Thickness

20% THINNER
Membrane Thickness ComparisonIONZERA350-410 μmZirfon500 μm500 μm scale20-30%thinnerThinner membrane = More compact stacks= Higher power density

Frequently Asked Questions

Why choose IONZERA for biogas upgrading in India?

IONZERA delivers 3x lower ionic resistance than Zirfon, making it ideal for biogas upgrading applications in India. IONZERA is manufactured by G-Hexa Research Center in Bengaluru, making it the only domestically produced high-performance AWE membrane in India.

Is IONZERA manufactured in India?

Yes. IONZERA is manufactured by G-Hexa Research Center in Bengaluru, Karnataka. It is the only high-performance AWE separator membrane produced domestically in India, eliminating import dependency for this critical electrolyser component.

How does IONZERA support the National Green Hydrogen Mission?

IONZERA directly supports NGHM by providing a domestically manufactured, high-performance membrane that reduces electrolyser costs. Its 3x lower resistance compared to imported alternatives improves hydrogen production efficiency, helping India achieve its 5 MT green hydrogen target by 2030.

Ready to Start

Request Biogas Upgrading Samples for India

Contact G-Hexa for IONZERA biogas upgrading membrane samples, technical specifications, and volume pricing for India-based projects.

Request Sample