INDUSTRIAL CORRIDOR

INDUSTRIAL CORRIDOR

Biogas Upgrading for Automotive Hydrogen in Chennai

Biological methanation converts the CO2 fraction of biogas into additional methane using green hydrogen. Chennai and the Tamil Nadu industrial corridor are home to major automotive manufacturing, petroleum refining, and chemical processing operations.

Local Brief

Chennai

Industry Focus

Automotive HydrogenRefiningChemical ProcessingRenewable Energy

0.1

Ω·cm²

350

μm

3x

Lower

Logistics

1-2 day road freight from Bengaluru

More Methane from Every Biogas Plant

Raw biogas contains 35-45% CO2. Adding green H2 via methanation converts this CO2 to CH4, increasing biomethane output by up to 70% without additional feedstock.

Lower H2 Production Cost

IONZERA's 3x lower area resistance reduces the cost of the hydrogen input, the primary variable cost in biological methanation, improving the economics of biogas upgrading.

Compact Electrolyser Integration

IONZERA's thin profile enables compact electrolyser stacks that fit within the footprint constraints of existing biogas plant sites, simplifying retrofit installations.

Biogas Upgrading in Chennai

Chennai and the Tamil Nadu industrial corridor are home to major automotive manufacturing, petroleum refining, and chemical processing operations. The state's aggressive renewable energy targets and industrial hydrogen demand make it a key market for alkaline electrolysis deployment. Tamil Nadu's growing wind and solar capacity provides renewable electricity for green hydrogen production.

Chennai is just 1-2 days from the IONZERA manufacturing facility in Bengaluru, providing the fastest delivery outside the manufacturing city itself. Tamil Nadu's automotive and refinery sectors benefit from IONZERA's efficiency improvements for on-site hydrogen production at competitive domestic pricing.

Automotive HydrogenRefiningChemical ProcessingRenewable Energy
20%

Thinner Profile

3x

Lower Resistance

TECHNICAL ADVANTAGE

IONZERA Performance for Chennai

Raw biogas contains 35-45% CO2. Adding green H2 via methanation converts this CO2 to CH4, increasing biomethane output by up to 70% without additional feedstock.

Membrane Thickness

20% THINNER
Membrane Thickness ComparisonIONZERA350-410 μmZirfon500 μm500 μm scale20-30%thinnerThinner membrane = More compact stacks= Higher power density

Frequently Asked Questions

Can I get IONZERA biogas upgrading membranes in Chennai?

Yes. G-Hexa ships IONZERA membranes to Chennai, India. 1-2 day road freight from Bengaluru

Why use IONZERA for biogas upgrading in Chennai?

IONZERA delivers 3x lower ionic resistance than Zirfon, reducing cell voltage and electricity costs for biogas upgrading applications. Chennai is just 1-2 days from the IONZERA manufacturing facility in Bengaluru, providing the fastest delivery outside the manufacturing city itself.

How fast can IONZERA reach Chennai?

IONZERA ships from Bengaluru to Chennai in 1-2 days via road freight. Same-day express delivery is possible for urgent requirements.

Ready to Start

Request Biogas Upgrading Samples for Chennai

Contact G-Hexa for IONZERA biogas upgrading membrane samples and technical support for your Chennai project.

Request Sample