REFINERY HYDROGEN

REFINERY HYDROGEN

Biogas Upgrading for Petroleum Refining in Mumbai

Biological methanation converts the CO2 fraction of biogas into additional methane using green hydrogen. Mumbai and the broader Maharashtra-Gujarat refinery corridor host some of India's largest petroleum refining and petrochemical operations.

Local Brief

Mumbai

Industry Focus

Petroleum RefiningPetrochemicalsChemical ProcessingFertilizer

0.1

Ω·cm²

350

μm

3x

Lower

Logistics

2-3 day road freight from Bengaluru manufacturing facility

More Methane from Every Biogas Plant

Raw biogas contains 35-45% CO2. Adding green H2 via methanation converts this CO2 to CH4, increasing biomethane output by up to 70% without additional feedstock.

Lower H2 Production Cost

IONZERA's 3x lower area resistance reduces the cost of the hydrogen input, the primary variable cost in biological methanation, improving the economics of biogas upgrading.

Compact Electrolyser Integration

IONZERA's thin profile enables compact electrolyser stacks that fit within the footprint constraints of existing biogas plant sites, simplifying retrofit installations.

Biogas Upgrading in Mumbai

Mumbai and the broader Maharashtra-Gujarat refinery corridor host some of India's largest petroleum refining and petrochemical operations. These facilities consume significant volumes of hydrogen for desulfurization and hydrocracking processes, creating a natural market for on-site green hydrogen production via alkaline electrolysis. The region's chemical and fertilizer industries further amplify hydrogen demand.

IONZERA is manufactured in Bengaluru, providing Mumbai-based projects with 2-3 day road freight delivery and zero import duties. For refineries transitioning from grey to green hydrogen, IONZERA's 3x lower membrane resistance reduces the electricity cost per kg of hydrogen, improving the payback period for electrolyser investments. G-Hexa provides direct technical support and rapid sample delivery.

Petroleum RefiningPetrochemicalsChemical ProcessingFertilizer
20%

Thinner Profile

3x

Lower Resistance

TECHNICAL ADVANTAGE

IONZERA Performance for Mumbai

Raw biogas contains 35-45% CO2. Adding green H2 via methanation converts this CO2 to CH4, increasing biomethane output by up to 70% without additional feedstock.

Membrane Thickness

20% THINNER
Membrane Thickness ComparisonIONZERA350-410 μmZirfon500 μm500 μm scale20-30%thinnerThinner membrane = More compact stacks= Higher power density

Frequently Asked Questions

Can I get IONZERA biogas upgrading membranes in Mumbai?

Yes. G-Hexa ships IONZERA membranes to Mumbai, India. 2-3 day road freight from Bengaluru manufacturing facility

Why use IONZERA for biogas upgrading in Mumbai?

IONZERA delivers 3x lower ionic resistance than Zirfon, reducing cell voltage and electricity costs for biogas upgrading applications. IONZERA is manufactured in Bengaluru, providing Mumbai-based projects with 2-3 day road freight delivery and zero import duties.

How quickly can IONZERA be delivered to Mumbai?

IONZERA ships from Bengaluru to Mumbai in 2-3 days via road freight. Express air cargo is available for urgent requirements. No customs clearance or import duties apply since IONZERA is manufactured in India.

Ready to Start

Request Biogas Upgrading Samples for Mumbai

Contact G-Hexa for IONZERA biogas upgrading membrane samples and technical support for your Mumbai project.

Request Sample